| Recent Answers |
 |
 |
2008-08-06 Plant Automation/Controls - Water tap timer switch: Hi Larry, Sorry for my late reply -- I forgot to turn on my vacation setting. Unfortunately I don't have much advice for you -- all my experience is based on controls that need electricity to operate...
|
2008-07-30 Manufacturing - quality blueprints: Since it looks like your main objective is to pass a test, I'd suggest finding a book on drawing interpretation and spending a little time studying some examples. (There are a number of books available--any...
|
2008-07-01 Manufacturing - Key Characteristics: Sure John, send me a link (or whatever). In my experience, the biggest problem with KCs is the fact that design--and in some cases MFG--failed to recognize exactly what's required AFTER something was designated...
|
2008-06-26 Manufacturing - Traceability: I guess it would depend on the situation, Ron. If I understand correctly that you're physically re-verifying piece part attributes, I would certainly question the value of that. Is it that you don't trust...
|
2008-06-23 Manufacturing - questions: I looked online for the information you requested. I was not able to find any coursework descriptions for a general design engineering degree. Try calling to a local College of Engineering. If you tell...
|